Kitchen with white shaker cabinets, gray tile backsplash and a marble-look island with seating
Kitchens For Spring Hill — Built from Broad Street

Florida Licensed Building Contractor · CBC1267270

Kitchen Remodeling near Spring Hill, FL

Spring Hill homeowners hire Montesanti Construction to rebuild the kitchen they cook in every day: new cabinets and counters, an island or an opened-up layout, and the plumbing, electrical, drywall and flooring behind it, all run by one licensed builder from Brooksville. For our full approach across Hernando County, start with our kitchen remodeling services.

10×Spring Hill’s growth
from 1980 to 2000
25Years of experience
in the trade
CBCCBC1267270 · Florida
licensed building contractor
Know The House — Before we draw anything

Most Spring Hill kitchens were built in the boom years

In 1980 the census found roughly 6,500 people living in Spring Hill. Twenty years later it counted about 69,000. Many kitchens here date from that stretch, and plenty still have the layout the builder gave them.

That timing shapes the job. Kitchens from the era often have a closed galley or a wall between the kitchen and the family room, soffits above the upper cabinets, and a single circuit expected to power far more than it was planned for. None of that rules out a remodel. It simply means the estimate should say what is inside the soffit, whether the wall can come out, and how many new circuits the appliances need, instead of leaving those questions for demolition day.

Soffits and bulkheads

Some are empty boxes, others hide a duct or a vent pipe. We check before you choose cabinets that run to the ceiling.

The wall in the way

Whether it carries load decides whether opening the room is a patch-and-paint job or a beam, a permit and an inspection.

Power for today’s appliances

Induction ranges, double ovens and island outlets usually need dedicated circuits, run by our licensed electrical partner.

Islands & Layout — A job in progress

Adding an island the kitchen can actually hold

This island was extended on one of our jobs with turned legs and a new granite top. The photo was taken before the apron was painted to match the cabinets.

An island has to leave room to open the dishwasher and the oven door while someone walks past, so we measure the aisles first and size the top to fit them. Seating overhang, outlets on the island and any sink or cooktop in it are settled on the drawing, before the counter is templated.

Kitchen island extension with turned legs and a granite top, wood apron not yet painted
During — an island extension framed with turned legs, granite set, apron still to be painted
What We Build — Wall to wall

Every part of a Spring Hill kitchen we rebuild

You can buy the whole room or one part of it, and each item is priced on its own line. Gaps left in walls or ceilings by a new layout are closed with drywall patched and finished to match, then painted, so the room is handed back complete.

Cabinets and counters

New cabinet boxes and doors, crown and trim, quartz or granite tops measured once the cabinets are fixed in place, and a sink and faucet connected by our plumbing subcontractor, who holds a Florida plumbing license.

Backsplash and lighting

Tile set from the counter to the underside of the uppers, under-cabinet lights and pendants over the island, wired on their own switches.

Floors that run through

When the cabinets change footprint, the old floor rarely matches. We can lay new tile or plank flooring through the kitchen and into the rooms beside it.

After You Call — What happens next

The order a Spring Hill kitchen job follows

Nothing is torn out until everything that goes back in is on order.

I

A visit to your kitchen

We measure, open the sink cabinet, look into the attic above the soffits and ask what frustrates you about the room today. The written estimate follows the visit.

II

Drawings, choices and orders

Layout, cabinet line, counter material, tile and fixtures are settled and ordered. Permits for work like a bearing wall or new circuits are filed at this stage.

III

Tear-out to final walk

Demolition, rough-ins and inspections, then cabinets, counters, backsplash, flooring and paint in sequence. We walk through the room together and close out every item on the punch list.

Keep Or Replace — The cabinet question

Do your cabinets need replacing, or just repainting?

Solid cabinet boxes in a layout you like can often stay. Swollen bases under the sink, sagging shelves or a layout that no longer works are the signs they should go.

If the boxes are sound, professional cabinet painting with new hardware and counters changes the room for a fraction of a full remodel. If they are not, painting only hides the problem for a while. We will tell you which side of that line your kitchen is on and price both options when it is close.

  • Keep: plywood or solid boxes, doors that still close square, a layout that suits how you cook.
  • Replace: particleboard swollen around the sink, drawers that drag, or a footprint that blocks the island you want.
Kitchen with white shaker cabinets, herringbone tile backsplash and stone-look counters
Finished kitchen with white shaker cabinets and a herringbone tile backsplash

Tired of cooking in a kitchen from 1990?

Comparing Bids — Line by line

Reading two kitchen quotes side by side

Kitchen quotes that look far apart are often pricing different jobs. Lining them up item by item usually shows where the gap really comes from.

A quote you can hold someone to

Cabinet line and finish named, counter material and edge spelled out, electrical circuits counted, disposal of the old kitchen included, and allowances shown as dollar figures you can see.

A quote that grows later

One lump sum with “cabinets and counters” and little else. Missing permit fees, no mention of the soffit or the wall, and electrical left as “by others” tend to become change orders.

  • A license number you can look up. Florida’s DBPR lists every building contractor online; check ours, CBC1267270, before you sign.
  • Appliance models chosen early. Range, refrigerator and dishwasher sizes should be fixed before cabinets are ordered, or the openings may not fit.
  • Change orders in writing. When a choice changes mid-job, the new price is signed before the work goes ahead.
Google Reviews — Posted by clients

Three remodel clients, word for word

Copied from Google without edits.

★★★★★
Montesanti Construction did such an incredible job remodeling our kitchen with precise attention to detail. Always cleaned up after their work and always very easy to talk to.
Conrad B. · Aug 3, 2026 · Google review
★★★★★
HIGHLY RECOMMEND!! We had our home renovation completed by Montesanti Construction. It involved a pretty comprehensive project with the kitchen, bathrooms, living areas, some structural, and whole house water conditioning and reverse osmosis. They did an OUTSTANDING JOB!! Their level of expertise, professionalism and eye for detail was unsurpassed. They really TRANSFORMED our home and made it BEAUTIFUL!! My wife and are so pleased!! We HIGHLY RECOMMEND them.
Paul P. · Apr 10, 2026 · Google review
★★★★★
The team was absolutely incredible and really great to work with. They did a fantastic job on a remodel and provided a great service and experience for our team.
Dylan T. · Feb 26, 2026 · Google review
Where We Work — One office, nearby towns

About 20 minutes from Brooksville to your kitchen

Twelve miles of road separate Spring Hill from the Broad St building in Brooksville that serves as our one office. Crews leave from there for every Spring Hill measurement, delivery and install, and that team also covers Weeki Wachee and nearby Hernando County towns. If the bathroom is next on your list, read about our Spring Hill bathroom remodels.

Hours and job photos are posted on the Montesanti Construction Google profile. More client feedback is gathered on our reviews page.

Kitchen FAQ — Before the first visit

Spring Hill kitchen remodeling questions

Why won’t you give me a kitchen price over the phone?

Because two kitchens of the same size can land far apart. Keeping or moving the sink, the cabinet line you choose, the counter material, whether a soffit hides ductwork, and how much electrical the new appliances need all move the total. We visit and measure, and the estimate that follows lists firm costs and allowances on separate lines.

Can you open up a closed Spring Hill kitchen to the living room?

Often, yes. The first question is whether the wall carries roof load and what runs inside it. A non-bearing wall can usually come out with drywall and flooring patched in. A bearing wall needs a properly sized beam and a permit. We tell you which one you have before anything is drawn.

Will you install cabinets I already bought?

We can, once we have checked that the boxes, measurements and filler pieces actually fit the room and the appliances. If something is short, it is far cheaper to find out on paper than on installation day.

How do we cook while the kitchen is being remodeled?

Most families set up a temporary station in another room with the refrigerator, a microwave and a small counter. Because cabinets and counters are ordered before demolition, the kitchen is only out of use for the build itself, and your written schedule shows those days in advance.

Do you travel to Spring Hill for kitchen work?

Yes, regularly. Our crews drive down from 252 Broad St in Brooksville, a trip of roughly 20 minutes, for every visit, delivery and install.

Is a kitchen remodel worth it if we might sell in a few years?

That depends on the house and the neighborhood, so we will not promise a return. We can, however, price a lighter scope, such as painted cabinets, new counters and lighting, next to a full remodel, so you can compare what each one costs before you decide.

Start Here — A visit and a written estimate

Let’s look at the kitchen together

Bring the photos you have saved and the things you would change tomorrow. We will drive over from Brooksville, measure the room and come back with a scope and a price in writing.